在注塑模具(jù)廠家在驗收模具(jù)的時候,要注意一些常見的問題,這裏小(xiǎo)編來詳細介紹下。
In the acceptance of injection mold manufacturers, we should pay attention to some common problems. Here is a detailed introduction.
由於驗收模具過程中總是伴隨著某些風險,任何可以想象得到(dào)的、都可(kě)能發生的情況我們事前都要進行風險評估。重點應該關注模具的複雜程度、備件的(de)關鍵特性、配件的後處理質量、以及在移動模具過程中任何(hé)可預見的突發性風險。
As there are always some risks in the process of mold acceptance, we must conduct a risk assessment in advance for any conceivable and possible situation. The focus should be on the complexity of the mold, the key characteristics of spare parts, the aftertreatment quality of accessories, and any foreseeable sudden risks in the process of moving the mold.
若評估發現後得出了較高的風險係數,則收貨前越需要做詳細(xì)的(de)搬運前準備工作。收到貨後應該盡量避(bì)免發生模具(jù)損壞,導致停工停產,對注塑(sù)生產業務經營造(zào)成負麵影響等情況。
If a higher risk coefficient is obtained after the evalsuation, the more detailed preparations need to be made before receiving the goods. After receiving the goods, we should try our best to avoid mold damage, resulting in downtime, which will have a negative impact on the operation of injection molding production business.
濟南注塑加工廠家認為應該觀察一套(tào)模具加工的運轉情況,包(bāo)括檢查模腔的狀況、循(xún)環時間、製模工藝條件,不可思議(yì)的四點就是進行(háng)價值評(píng)估。
Jinan injection molding manufacturers believe that they should observe the operation of a set of mold processing, including checking the condition of the mold cavity, cycle time, and molding process conditions. The incredible four points are value evalsuation.

如果模具正處於不是(shì)正處於運轉當中,尤其(qí)模具(jù)已經長時間停用的情況(kuàng)下,在模具準備移送之前,需先進行試加工,評估該套模具的使用價值。
If the mold is in operation or not, especially when the mold has been out of service for a long time, it is necessary to carry out trial processing before the mold is ready for transfer to evalsuate the use value of the set of molds.
對保留下來(lái)的試樣件盡可能了解到部分(fèn)信(xìn)息,但更多的詳細情況就不可能知道了。可能沒有了解到實際生產時的工藝(yì)條件,或者不知道經過修正的工(gōng)藝參數。循環時間不(bú)能通過推斷(duàn)來判定,特殊的輔(fǔ)助設備儀器可能沒有被提醒(xǐng)注意。
Try to know some information about the retained samples, but it is impossible to know more details. You may not know the actual production process conditions, or you may not know the corrected process parameters. The cycle time cannot be determined by inference, and special auxiliary equipment and instruments may not be reminded.
如果(guǒ)模具在加工某個部件隻是(shì)應用了這套模具中的部分型腔,而不是模具在滿型腔注射的運轉狀態的話,那麽(me)發給客戶看的各個數(shù)據的加工參數(shù)就理所當然地值得懷疑。
If the mold only applies part of the cavity in the mold when processing a certain part, rather than the operation state of the mold injected in the full cavity, then the processing parameters of various data sent to the customer for viewing are naturally questionable.
Before the seller delivers the mold, the test run shall be carried out under the full mold cavity injection state on the injection machine, so as to test the quality of each product of the mold. Come to our website for more relevant content http://www.lsjtcyjt.cn Take a look.