注塑模具(jù)廠家在驗收模具時,要注意一些常見的問題(tí),因此需要提前了解好,然後做好預(yù)防措施,這樣才能順利進(jìn)行下一步的工作,下麵來解析下問題內容吧。
Injection mold manufacturers should pay attention to some common problems when accepting molds, so they need to understand them in advance, and then take preventive measures, so as to smoothly carry out the next step of work. Let's analyze the content of the problem.
由於接受模具的過程中總是伴隨著(zhe)一定的風險,所以對於任何可以想象和可能出現的情況,我們都須提前進行風險評估(gū)。重點應放在模具的(de)複(fù)雜性、備件的關鍵特性、零件後處理的(de)質量以及移動(dòng)模具過程中的任(rèn)何可預見的意外事件上。
As there are always certain risks in the process of accepting molds, we must carry out risk assessment in advance for any conceivable and possible situation. The focus should be on the complexity of the mold, the key characteristics of the spare parts, the quality of the post-processing of the parts, and any foreseeable accidents in the process of moving the mold.
如果評估(gū)後發現風險因素較高,則需(xū)要在收貨前做(zuò)好更詳細的搬家前(qián)準備(bèi)工作。收到貨後,應盡量避免模具損壞的發生,導致停產停產,對注塑生產(chǎn)企業(yè)經營產生負麵影響。
If the risk factors are found to be high after the assessment, more detailed preparations should be made before the goods are received. After receiving the goods, we should try our best to avoid mold damage, which will lead to shutdown and have a negative impact on the operation of injection molding production enterprises.

濟南注塑模具廠家建(jiàn)議(yì)在觀(guān)察一組模具加工的運行(háng)情況,包括檢查模腔狀況、周期時間、成型工藝條件,其中(zhōng)不可思議(yì)的四點就是評估價值。如果(guǒ)模具不工作,特別是(shì)模具長(zhǎng)時間不用,在模具(jù)準備好轉移之前,需要進行(háng)試加(jiā)工,評估模具的使用價值。
Jinan injection mold manufacturers suggest observing the operation of a group of mold processing, including checking the mold cavity condition, cycle time and molding process conditions, among which the incredible four points are the evalsuation value. If the mold does not work, especially if the mold is not used for a long time, it is necessary to carry out trial processing and evalsuate the use value of the mold before the mold is ready for transfer.
剩下的(de)標本可以盡可能多地知(zhī)道,但不可能知道更多的(de)細節。實際生產工藝條件可能未知(zhī),或者修改後的工藝參數可能未知。循(xún)環時間不能(néng)外(wài)推,特(tè)殊(shū)的(de)輔助設備可能(néng)不(bú)會引(yǐn)起注意。
The remaining specimens can be known as much as possible, but it is impossible to know more details. The actual production process conditions may be unknown, or the modified process parameters may be unknown. The cycle time cannot be extrapolated, and special auxiliary equipment may not attract attention.
如果模具在加工一個零件時隻使用模具中的部分型腔,而不是(shì)模具在全型腔注射時的運行狀態,那麽發(fā)給客戶的各種數據(jù)的加工參數(shù)當然是有問題的。賣方交付模具前,在注塑機上進行(háng)滿腔注射狀態的試車,以檢查模具每件產品的質量。
If the mold only uses part of the cavity in the mold when processing a part, rather than the running state of the mold when it is injected in the full cavity, the processing parameters of various data sent to the customer are certainly problematic. Before delivering the mold, the Seller shall conduct a full injection test on the injection molding machine to check the quality of each product of the mold.
注塑(sù)模具廠家收模時常(cháng)見問題解析相關內容就(jiù)是這樣了,如果您對存在的問題不上心,那麽就會影響到注塑產品的質量,造成損失(shī),更多信息獲(huò)取就(jiù)來網站
http://www.lsjtcyjt.cn谘詢吧。
This is the content related to the analysis of common problems when the injection mold manufacturer collects the mold. If you are not concerned about the existing problems, it will affect the quality of injection molding products and cause losses. For more information, please visit the website http://www.lsjtcyjt.cn Consult.